Orders placed prior to February 4th, 2023 will have a lead time 5-6 weeks. Orders placed February 17th, 2023 onwards will have a lead time of 4 weeks.

Product Care

We have built our products to last but we need your help. Please follow the product care instructions below. If you have questions about product care that are not answered below feel free to reach out via our contact form. Any and all questions are accepted. 

As a general practice we suggest using precaution when introducing new environments to your table. Concrete is a porous material that will absorb liquid spills. 

  • Please cover table surfaces when possible to prevent damage. If spills occur, blot with a dry cloth immediately. 
  • To avoid water rings do not place wet items on the table without coasters. Please double check that decor items such as vases do not leak before placing them on the table.
  • Using coasters and placemats under glasses and hot dishes will lengthen the lifespan of the protective sealer used on your table. 
  • Brightly coloured liquids/solids (wine, turmeric, pasta sauce, etc.) left unattended can cause discolouration. We recommend avoiding exposure to direct sunlight and heat to prevent fading and cracking. 

To clean, wipe with a dry/ slightly damp cloth. In the unlikely event that you have a stubborn stain, do a spot test with a ph neutral cleanser in a discreet area before using it on the surface. Do NOT use lysol or harsh chemicals as they will strip the sealer. Reseal yearly depending on use/wear and tear.